Electrical dashboard Permit needs The on-line allow is obtainable for properties in barisalcity.org with a residential zoning district. Zoning district information is easily accessible on-line by clicking E-Zoning.

You are watching: What gauge wire for 125 amp sub panel

This permit will permit replacement of the existing electrical panel as much as a best of 200 amps in the exact same location.Note: part properties in barisalcity.org have actually an underground electrical power feeding from PG&E. If her property has actually an underground power feed, verify through PG&E that they can provide increased power for a larger panel size.To identify if the proposed panel is sized as necessary for your requirements OR if you desire to watch if the proposed panel is huge enough because that an all-electric house, please finish an electrical panel sizing spreadsheet. An electric permit is forced for replacement and upgrade the the key electrical organization panel prior to installation the the brand-new panel. Adhering to is a listing of the general requirements for electric panel replacements based upon the 2019 California electrical Code. This catalog is to plan to carry out general information, call the building Safety division for any type of questions or additional information.General Requirements - The key electrical service shall be set up with strict conduit. Electric metallic tubing may be used where the service drop is attached come the building. The company entrance cable might be used, listed the authorized fittings are supplied with the cable, such together a rain-tight service head or developing the cable goose-neck, taped or painted, and also held securely in ar by a fitting authorized for the purpose. (Article 230)The minimum size business conduit shall it is in 1-1/4”. The minimum size company entrance cable shall be rated 100 amperes minimum for single family dwellings. For solitary family homes, the service disconnect method shall have actually a rating of less than 100 amperes, 3-wire. A larger service may be forced for brand-new homes or enhancements to existing homes based upon the actual fill calculations. (CEC 230.79(C))Service enntrance gate Conductors (Wires) – Conductors the extend across a roof shall have actually a minimum upright clearance that 3’ above the roof surface ar for roofs sloped 4:12 or an ext (18” clearance compelled when conductors enter through the roof overhang/eave). The service head chandelier be located so the the company drops, together with the open up wires in between the organization head and service drop, will have actually a minimum clearance of 10’ vertically above ground and also 3’ radius from doors and windows. (Article 230.24)The neutral (grounded) conductor must be identified with white tape at both terminals. (Article 200.6(B)(4))Service enntrance gate conductors and cables shall be approved for a wet location and, as soon as exposed to straight sunlight, candlestick be noted and significant as “sunlight resistant.” business entrance conductors and conduit candlestick be sized according to the following table (based top top CEC chapter 9 table 1):
SERVICE enntrance gate CONDUCTORS SIZE and also RATING
Service or Feeder RatingCopper ConductorsAluminum or Copper-CladAluminumMinimum ConduitSize
100 Amps#4 AWG#2 AWG1 ¼ inch
125 Amps#2 AWG#1/0 AWG1 ¼ inch
150 Amps#1 AWG#2/0 AWG1 ¼ inch
200 Amps#2/0 AWG#4/0 AWG1 ½ inch
The ground connection conductors must be figured out by white or grey tape at both end (200.6).Meter location - PG&E needs the height of the meter to be 48” to 66” above the ground. PG&E prohibits brand-new meters top top exterior walls adjacent to bedrooms or bedroom closets. A minimum horizontal clearance that 36” indigenous the gas meter and also piping is required.

See more: Romeo And Juliet Characters Family Tree By Simon Brinkleton, Romeo & Juliet

Working space - The clean working room in former of the dashboard shall it is in 30” large by 36” deep through a minimum headroom clearance of 6’-6” (Article 110.26)Grounding the Services - ground connection shall consist of a consistent grounding electrode conductor operation from the dashboard to a ground stick (grounding electrode) and to the cold water pipe. Grounding of the electrical business at the main water line need to be in ~ the an initial 5’ the water piping into the building. The secret water organization shall no be supplied as the ground connection electrode there is no supplemental electrode. For new structures and enhancements to currently structures, a concrete encased floor electrode shall be installed. This candlestick consist the 20’ the ½” ceiling or zinc-coated rebar or ceiling copper wire in the portion of the footing in call with earth. (CEC 250.52(A)(3)(1) and also 250.52(A)(3)(2))For currently structures, the ground connection electrode shall it is in nonferrous (copper), listed, and not be less than 5/8” in diameter. The electrode candlestick be set up such the at least 8’ of size is in contract through the soil. The upper finish of the electrode shall it is in flush v or listed below ground level unless the above-ground end and the grounding electrode conductor attachments is protected versus physical damage. (CEC 250.52 (A)(5), 250.64(B))The forced grounding electrode conductor (from electrode come panel) dimension is listed in the following table:
GROUNDING ELECTRODE CONDUCTOR SIZING (Table 250.66)
Size of key PanelCopper ConductorsAluminum or Copper-Clad Aluminum
100 Amps#8 AWG#6 AWG
125 Amps#8 AWG#6 AWG
150 Amps#6 AWG#4 AWG
200 Amps#4 AWG#2 AWG
Bonding - Bonding the the hot, cold, and also gas lines is required when the electric panel is replaced. Bonding that the hot, cold, and gas present is forced with water service replacements (if using a less conductive product than is existing) and also for every re-pipes. Bonding shall consist that a constant bond jumper installed at the water heater between the hot, cold, and also gas lines. The bonding jumper shall be sized based upon the complying with table. (CEC250.4(A)(4))
BONDING JUMPER SIZING (Table 250.102(C)(1))
Size of main PanelCopper ConductorsAluminum or Copper-Clad Aluminum
100 Amps#8 AWG#6 AWG
125 Amps#6 AWG#4 AWG
150 Amps#6 AWG#4 AWG
200 Amps#6 AWG#4 AWG
The electrical Panel allow is NOT available on-line if girlfriend are: installation the brand-new electrical panel in a different location. installation a brand-new electrical panel larger than 200 amps. Installing additional sub-panels with the new electrical panel. Performing extr electrical work-related in conjunction through the brand-new electrical panel installation.
If any of the above conditions apply, the allow shall be issued in ~ the One-Stop permit Center, City Hall, 456 W Olive Avenue. Specific procedure information is available at the Building division web site.
InspectionsA minimum of 2 inspections space required, a utility release and a final. The energy release inspection should be scheduled once the brand-new panel is installed and ready to be hooked increase the PG&E supply. The structure inspector will carry out a energy release form which will should be detailed to PG&E to have actually the it is provided hooked up to the new panel. A cable lath investigate is required for stucco repairs. A final inspection must be reserved after every one of the work is complete.
*